- Home
- /
- Manager's Messages
- /
- Coral Tree Plaza Weekly Update – Friday May 15, 2026
Coral Tree Plaza Weekly Update – Friday May 15, 2026
Posted By mcasillas on May 20, 2026
GARAGE SPEED (5 MPH), HEADLIGHTS & PARKING
The speed limit in the garage is 5 miles per hour. Please drive slowly and safely when in the garage, as people may be walking to and from their parked vehicles. Also, when pulling out of the garage please use caution and be mindful of pedestrians and the mirror mounted to the exterior of the garage rampway entrance for blind spots.
Please be mindful of the signage stating, “Incoming Cars Have Right of Way, Slow 5MPH”.
When parking, please be mindful of your neighbor(s) and park within the lines of your assigned parking space(s) as this will be greatly appreciated by your neighbor. Thank you!
MINDFUL OF NOISE LEVELS
Please be mindful and courtesy with regard to voice levels, TV noises, pet noises, unnecessary noises and boisterous conduct while within and around the Association Property or which can be heard outside your Residential Unit. Keep down the volume of radios, televisions, musical instruments, etc. that generate noise. Household appliances and power tools are sources of noise and should be operated at reasonable hours.
Particular attention should be paid to minimizing any sounds emanating from your unit between 10:00P.M. and 8:00 A.M. (City Ordinance). Be aware that balcony noise carries long distances.
STEEL THRESHOLD REPAIR NOTICE – PARKING STRUCTURE (P1 – P3)
As discussed at the Town Hall, Management would like to inform you of upcoming steel threshold repairs scheduled within the parking structure on Levels P1 – P3 began on Monday April 20, 2026.
Working Hours:
Monday – Friday | 9:00 AM – 5:00 PM
To minimize disruption, the project will be completed in phases by area and week.
- Parking Level 1 (P1) will be completed separately from Parking Levels 2 and 3 (P2 & P3)
- Work will impact Levels P1 – P3, including parking spaces, stairwells, elevator landings, storage areas, and mechanical rooms.
- There will be individual parking garage elevator landing closures specifically to the parking level and side being serviced per week based on the schedule provided below.
- There will always be a parking garage elevator in service and you may have to use the alternative buildings elevator.
PARKING GARAGE REPAIR SCHEDULE
P2 & P3 West (Week 5) Monday May 18, 2026
- West Stair Well – Space 190
- Stair well by ramp
- West Tower Elevator – Space 118
- West Tower Elevator – Space 213
- Stair Well by Ramp – Space 275
- West Stair Well
IMPORTANT INFORMATION
- Vehicles must be removed from impacted spaces prior to work (see weekly schedule)
- Temporary parking instructions will be provided in advance
- Residents should expect intermittent noise, dust, and limited access during work hours
- Safety closures will be enforced in active work zones—please follow all posted signage and staff direction
“The most important thing in communication is hearing what isn’t said.”
— Peter Drucker
Sincerely,
Marco Casillas
General Manager – Coral Tree Plaza
Action Property Management (800) 400-2284
Please visit the Coral Tree Plaza Resident Portal by going
to www.resident.actionlife.com