Happy Wednesday Everyone!
MANAGEMENT OFFICE CLOSED
General Manager, Marco Casillas will be taking Thursday September 14th & Friday September 15th off for vacation and the office will be closed. In the event you require assistance, you may contact Senior Manager, Justine Poulton: Jpoulton@actionlife.com.
After hour emergencies, please contact: (800)400-2284. Thank you!
FIRE HOSE REPLACEMENTS
We are on schedule to perform a Fire Life Safety Replacement per the 5 Year Fire Inspection. A&D Fire will be replacing every Fire Hose located in each Fire Hose Cabinet (43 Total) on Tuesday September 19, 2023.
The fire hoses are in every common area hallway and throughout parking garage levels P1 – P3. There are a total of nine (9) vehicles Management is requesting to be relocated to allow A&D Fire to perform the necessary replacements, due to the fire hose cabinets being in the parking space.
Please have the following parking spaces available on Tuesday September 19, 2023 from 8AM – 5PM.
- P1 – 12, 23 & 83
- P2 – 107, 118 & 178
- P3 – 191, 202 & 213
If your parking space is affected by this replacement and you require a parking space, please reach out to Management: mcasillas@actionlife.com.
ELEVATOR #1 REPAIR (WEST BUIDLING)
24 Hour Elevator has acquired the part to perform the repair to Elevator #1 located in the West building. The repair is scheduled to be performed (tomorrow) Thursday September 14, 2023. Thank you for your patience and understanding.
CHILLER REPAIR UPDATE
I have received a few emails regarding the chiller’s temperature and if it is working properly. The chiller is operational and is pending three (3) repairs to different parts of the system. One (1) of the two (2) compressors is working at a reduced capacity to prevent the chiller from turning off automatically, this will affect the cooling temperature coming from the chiller to your exclusive usage HVAC unit. The part for repair is expected to arrive early October and will be installed ASAP to get the second compressor back online. As soon as this repair is made, we will lower the temperature to the chiller back to normal.
There will be two (2) repairs to the chiller performed on Thursday September 28th & Friday September 29th. The chiller will not be operational for these two days.
The first repair, San Diego Mechanical Energy will resurface the condenser and apply an epoxy coating.
The second repair, San Diego Mechanical Energy will repair the three areas that are leaking coolant from the chiller.
“Happiness is not something readymade; it comes from your own actions.”
– The Dalai Lama
Sincerely,
Marco Casillas
General Manager – Coral Tree Plaza