Manager’s Messages

Weekly Update – Friday February 16, 2024

PRESIDENTS DAY – MANAGEMENT OFFICE CLOSED

The Management Office will be closed on Monday, February 19, 2024 in observance of Presidents Day.

CHILLER COMPRESSOR #2 REPLACEMENT

The time is finally here! San Diego Mechanical Energy is scheduled to replace the failed chiller compressor #2 on Tuesday February 20th & Wednesday February 21st. Please be advised, during the two days required for removal and installation, the chiller system will not be operational. This means water will not be circulating through the chiller system to provide AC to your exclusive usage HVAC system within your unit until the repair is complete.

DUMPSTER NOTICE

Global Disposal and Coral Tree Plaza have been able to schedule a large dumpster that will be dropped off on Monday, February 26th and picked up the following week on Monday, March 4th. The dumpster is going to be placed on the parking apron between both towers.

When dumping items, you are no longer interested in using, please make sure you are throwing away the correct material. The association will incur costs if the wrong materials are dumped, please refrain from throwing away items such as electronic waste (old phones, computers, tv, etc.), paint cans, or any related hazardous materials.

Management will schedule a separate day for Electronic Waste dispose.

SAVE THE DATE!!! – LEAP YEAR EVENT – THURSDAY FEBRUARY 29, 2024

The Social Committee has been actively working on planning a Leap Year Event for the residents of Coral Tree Plaza and is scheduled to be held on Thursday February 29, 2024 at 5:30PM – 7:30PM in the Clubhouse. Please mark your calendars and SAVE THE DATE!

“Accomplishment will prove to be a journey, not a destination.”

 –Dwight D. Eisenhower

Sincerely,

Marco Casillas

General Manager – Coral Tree Plaza

Action Property Management (800) 400-2284

Please visit the Coral Tree Plaza Resident Portal by going to www.resident.actionlife.com

Weekly Update – February 9, 2024

ELEVATOR CABIN OPERATING PANEL & SURFACE MOUNT REPLACEMENTS

24 Hour Elevator completed the West building COP Panel and Surface Mount installation. 24 Hour will be beginning the installation for the East building on Tuesday February 13th. This project will take two days to complete each elevator and one day to install the surface mounts for the common areas (1 week per building). Each elevator will be out of service for two (2) days until the installation is complete.

East Building: Tuesday February 13th – Friday February 16th

You may ask what is a Cabin Operating Panel and Surface Mount?

Cabin Operating Panel: Panel inside the elevator which contains the floor buttons, floor indicator and alarm buttons.

Surface Mounts: Common area surface mount hall stations (up and down buttons) to call the elevator.

If you have a delivery, move in/out or contractual work scheduled during the install time frames, please contact Management directly for coordination purposes at mcasillas@actionlife.com.

BICYCLES – CAUTION IN FREIGHT ELEVATOR

If you are storing your bicycle inside of your unit, Management asks you to use the Freight Elevator when bringing your bicycle up/down. The purpose of using the freight elevator is to provide you with more room when entering and prevent damage to the interior elevator panels. Any damage to the interior of the elevator panels is very costly to repair / replace, please be on the side of caution when entering the freight elevator with your bicycle. Thank you!

RIGHT OF PASSAGE – INCOMING VEHICLES RIGHT AWAY

When a vehicle is coming from southbound on 6th Ave and preparing to turn right into the garage and at the same time someone is leaving the garage and turning right onto 6th Ave. You may question, who has the right of way?

Per the California Driver’s Handbook (Section 7: Laws & Rules of the Road)

Entering Traffic: When entering traffic, you must proceed with caution and yield to the traffic already occupying the lanes.

A vehicle leaving the parking garage does not have the right of way and must always wait for the incoming vehicle. Please remember, the parking garage speed limit is 5 MPH.

“Being deeply loved by someone gives you strength, while loving someone deeply gives you courage.”

 – Lao Tzu

Sincerely,

Marco Casillas

General Manager – Coral Tree Plaza

Action Property Management (800) 400-2284

Please visit the Coral Tree Plaza Resident Portal by going to www.resident.actionlife.com

Weekly Update – February 2, 2024

Happy Friday Everyone!

BOARD MEETING – MONDAY FEBRURY 5, 2024

The Board of Directors Meeting is scheduled for Monday February 5, 2024, at 5:30PM and will be held via Zoom.

Join Zoom Meeting

https://actionlife.zoom.us/j/96785656534?pwd=RFhPUTJkYVpJemRhUGlSYnBUdVhTZz09

You will be prompted to enter meeting ID below

Meeting ID: 96785656534

Password: 326738

One tap mobile (Audio Only)

tel:+12133388477,,96785656534#

tel:+16692192599,,96785656534#

tel:+13462487799,,96785656534#

Join by Phone (Audio Only)

+1 213 338 8477 US (Los Angeles)

+1 669 219 2599 US (San Jose)

+1 346 248 7799 US (Houston)

ELEVATOR CABIN OPERATING PANEL & SURFACE MOUNT REPLACEMENTS

The time has finally come to replace the cabin operating panels and surface mounts in the residential elevators and common area hallways for the East & West Building (Garage Elevators not included). This project will take two days to complete each elevator and one day to install the surface mounts for the common areas (1 week per building). Each elevator will be out of service for two (2) days until the installation is complete.

West Building: Monday February 5th – Friday February 9th

East Building: Monday February 12th – Friday February 16th

You may ask what is a Cabin Operating Panel and Surface Mount?

Cabin Operating Panel: The panel inside the elevator that contains the floor buttons, floor indicator and alarm buttons.

Surface Mounts: Common area surface mount hall stations (up and down buttons) to call the elevator.

If you have a delivery, move in/out or contractual work scheduled during the install time frames, please contact Management directly for coordination purposes at mcasillas@actionlife.com.

SAVE THE DATE!!! – LEAP YEAR EVENT – THURSDAY FEBRUARY 29, 2024

The Social Committee has been actively working on planning a Leap Year Event for the residents of Coral Tree Plaza and is scheduled to be held on Thursday February 29, 2024 in the Clubhouse. Please mark your calendars and SAVE THE DATE!

Further information will be provided. Thank you!

“The more you learn, the more you realize how much you don’t know.”

  • Andrew Huberman

Sincerely,

Marco Casillas

General Manager – Coral Tree Plaza

Action Property Management (800) 400-2284

Please visit the Coral Tree Plaza Resident Portal by going to www.resident.actionlife.com

Weekly Update – January 26, 2024

Happy Friday Everyone!

BOARD MEETING – WEDNESDAY JANUARY 31, 2024

The Board of Directors Meeting is scheduled for Wednesday January 31, 2024, at 5:30PM and will be held via Zoom.

Join Zoom Meeting

https://actionlife.zoom.us/j/92261501917?pwd=RTN0Z1BwNFBMaEtVRGtlSkowSkVnUT09

Password: 966658

One tap mobile (Audio Only)

+16692192599,,92261501917#,,#,966658# US (San Jose)

+12133388477,,92261501917#,,#,966658# US (Los Angeles)

Join by Phone (Audio Only)

        +1 669 219 2599 US (San Jose)

        +1 213 338 8477 US (Los Angeles)

You will be prompted to enter meeting ID below.

Meeting ID: 922 6150 1917

Password: 966658

GARAGE SPEED & HEADLIGHTS (5 MPH)

The speed limit in the garage is 5 miles per hour. Please drive slowly and safely when in the garage, as people may be walking to and from their parked vehicles. Also, when pulling out of the garage please use caution and be mindful of pedestrians and the mirror mounted to the exterior of the garage rampway entrance for blind spots.

Please be mindful of the signage stating, “Incoming Cars Have Right of Way, Slow 5MPH”.

ELEAVTOR CABIN OPERATING PANEL & SURFACE MOUNT REPLACEMENTS

The time has finally come to replace the cabin operating panels and surface mounts in the residential elevators and common area hallways for the East & West Building (Garage Elevators not included). This project will take two days to complete each elevator and one day to install the surface mounts for the common areas (1 week per building). The elevator worked on for two (2) days will not be operational until the installation is complete.

West Building: Monday February 5th – Friday February 9th

East Building: Monday February 12th – Friday February 16th

You may ask what is a Cabin Operating Panel and Surface Mount?

Cabin Operating Panel: The panel inside the elevator that contains the floor buttons, floor indicator and alarm buttons.

Surface Mounts: Common area surface mount hall stations (up and down buttons) to call the elevator.

If you have a delivery, move in/out or contractual work scheduled during the install time frames, please contact Management directly for coordination purposes at mcasillas@actionlife.com.

“Without struggle, no progress, and no result. Every breaking of habit produces a change in the machine.”

  • George Gurdjieff

Sincerely,

Marco Casillas

General Manager – Coral Tree Plaza

Action Property Management (800) 400-2284

Please visit the Coral Tree Plaza Resident Portal by going to www.resident.actionlife.com

Weekly Update – Friday January 12, 2024

Happy Friday Everyone!

A&D FIRE – FIRE HORN INSTALL (EAST BUILDING / 3635)

Management is picking up where we left off on the Fire Alarm System Upgrade as we have one more part of the project to complete for the East Building.

This project is to replace the in-unit fire alarm horns in every unit and hallway. A&D Fire will require access to each unit a few times throughout the day to ensure the Fire Horns sync with the Fire Panel.

The Fire Horn installation is scheduled to begin at 9AM on Tuesday January 23rd – Wednesday January 24th. A&D Fire will be starting at the top floors and working their way down.

Tuesday January 23rd – Floors 15 – 8

Wednesday January 24th – Floors 7 – 1

If you will not be home during the installation, please notify Management for permission to use the Emergency Key we have on file. This is a very important installation to be performed for the community and would appreciate it if you could send me a message to let me know if you will be home or if I can use the key on file. Please email me at mcasillas@actionlife.com.

EMERGENCY KEY

Do you have an emergency key on-file with Management or has your lock recently been changed? It is very important to have an up-to-date emergency key on file with the building. During an emergency situation, Management may require access to your unit.

“Happiness lies in the joy of achievement and the thrill of creative effort.”

– Franklin D. Roosevelt

Sincerely,

Marco Casillas

General Manager – Coral Tree Plaza

Action Property Management (800) 400-2284

Please visit the Coral Tree Plaza Resident Portal by going to www.resident.actionlife.com

Location

3635 & 3634 7th Ave
San Diego, CA 92101
phone | (619) 297-6004

Management Team

Manager
Marco Casillas | mcasillas@actionlife.com

Assistant
Wessal Mohammad | wmohammad@actionlife.com

Management Company

Action Property Management
www.actionlife.com
Regional Office
1133 Columbia Street Suite 106
San Diego, CA, 92101
phone | (949) 450-0202